Home About Us Industries Served Technical Data Careers Portfolio Contact Us Login
800-475-2072
Home // Projects Portfolio // Gomez Project

Gomez Project

preview

Project Scope

Individual Mold Segments

Mold Segments

Individual mold segments were designed and assembled to create a support structure to handle the 6,000 pounds of polyurethane material used in each part.
Tooling

Crane Lifting Mold

An overhead crane was used to lift and demold the 32’ section of tooling.
Underground Chamber

Demold

A total of 3 parts were cast for this project. A 7’ diameter 32’ deep underground chamber was created to cast and cure each part.
Polyurethane Yellow Section

Yellow Polyurethane Part

This photo shows the flexibility of the yellow section of polyurethane as it is being crane lifted into position for packaging.
Finished Products

Finished Product

Finished product loaded and ready for shipment.

Contact one of our sales representatives today
to inquire about a quote from Precision Urethane
or call us today at 800-475-2072


Projects Portfolio
Society of Plastics Engineers Polyurethane Manufacturers Association

Precision Urethane
612 3rd St
Hempstead, TX 77445

800-475-2072